Skip to main content
  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexible Power
    • Green Recovery
    • Innovation
    • Network Data
    • Smart Metering
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • A Force For Good
    • British Sign Language Interpreter
    • Education
    • Safety
    • Saving Energy
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
    • Customer Service Commitments
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Customer Engagement Group
    • Blogs
    • Your Powergrid
  • News
  • Careers

Login

WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

Login Menu
  • Connections
  • Cut Outs
  • Disconnections
  • Earth Requests
  • Enquiries
  • Equipment Problems
  • SafeDig
  • Safety Advice
  • Service Alterations
  • Shrouding
Northern Powergrid Homepage
  • My power is off
  • Get Connected
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Customer Engagement Group
    • Distribution System Operation
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • Force for good
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • New Power Generation
    • Safety
    • Saving Energy
    • Services Directory
    • Smart Metering
    • Stakeholder Engagement
Secondary Menu
  • Power cuts
  • Get Connected
  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

    At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

    Login Menu
    • Connections
    • Cut Outs
    • Disconnections
    • Earth Requests
    • Enquiries
    • Equipment Problems
    • SafeDig
    • Safety Advice
    • Service Alterations
    • Shrouding
  • Search

Explaining G98 and G99

EXPLAINING G98 AND G99

G98 and G99 are engineering recommendations that are part of the Distribution Operation Code. The code is a contractual obligation of operation between network operators and those customers connecting to it. It helps to keep everything safe and regulated. 

G98 and G99 specifically refers to different kinds of protection settings regulations that generator or storage assets must comply with to connect to the network.

The protection settings are an important fail-safe mechanism that protect both the network and the asset from potential faults. 

WHAT’S THE DIFFERENCE BETWEEN G98 AND G99?

Image
6730.17.jpg

If you are connecting single or multiple phase generators at a single premises  of up to16A(3.86kW) per phase you need to complete a G98 notification form. 

Image
6732.1342.jpg

If you are connecting single or multiple phase generators at multiple premises of up to 16A (3.86kW) per phase you need to complete a G98 application form prior to connecting.

Image
6734.1343.jpg

If you are connecting large scale generation, above 16A (3.86kW) per phase or energy storage, then you will need to complete a G99 form.

 

We have a decision making tool that can help you determine whether you need to make a G98 or G99 application. You can access it here.

 

G98 IN FOCUS

You need to submit a G98 application if you are applying to connect a generation up to 16A (3.86kW). Depending on the nature of your project, you will be required to complete different forms.

 If you are installing micro-generation at a single premises, you can make the installation but must notify us within 28 days of commissioning. The same criteria applies if you are connecting micro-generation at multiple premises that are more than 500 meters apart.

You can notify us online via this link or submit a G98 single premises application form.

If you are installing micro-generation at multiple premises in close geographic proximity, for example on the same street, you must apply to us before you can connect.

You can apply online via this link or submit a G98 Multiple Premises form.

G99 IN FOCUS

You need to submit a G99 application if you are applying to connect a generation asset that’s over 16A (3.86kW)  or connecting energy storage. Depending on the nature of your project you will need to complete different forms.

If you are installing generation or battery storage to our network , you must apply using a G99 form. This can be completed via this link.

If you are installing battery storage, you may be eligible for the fast-track electricity storage applications process. The eligibility requirements can be found online via this link. If you do not meet all the eligibility requirements, you will need to apply using the G99 application process.

USEFUL LINKS

  • For more information visit: northernpowergrid.com/get-connected/connecting-generation-storage
  • G98 or G99? Our helpful guide can help you to decide northernpowergrid.com/generation-connection-guide

 

 

BACK
National Helpline
105
MON-SUN
24 Hours

Have you checked out our Help & Advice directory, it may just have the answers that you're looking for.

Make an enquiry
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2022

Cookie settings