Skip to main content
announcement-icon Latest
announcement-icon-popup

Latest

Check out our be prepared page for advice on what to do before, during and after a power cut.

Have you joined our free Priority Services Membership? Find out more and join today

Check out our be prepared page for advice on what to do before, during and after a power cut.

Have you joined our free Priority Services Membership? Find out more and join today

  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexible Power
    • Green Recovery
    • Innovation
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Be Prepared
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Safety
    • Saving Energy
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Customer Engagement Group
    • Blogs
    • Your Powergrid
  • News
  • Careers

Login

WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

Login Menu
  • Connections
  • Cut Outs
  • Disconnections
  • Earth Requests
  • Enquiries
  • Equipment Problems
  • SafeDig
  • Safety Advice
  • Service Alterations
  • Shrouding
Northern Powergrid Homepage
  • My power is off
  • Get Connected
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Customer Service
    • Customer Welfare
    • Be Prepared
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Customer Engagement Group
    • Distribution System Operation
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Open Data Portal
    • New Power Generation
    • Safety
    • Saving Energy
    • Services Directory
    • Smart Metering
    • Stakeholder Engagement
    • Weather Aware
Secondary Menu
  • Power cuts
  • Get Connected
  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

    At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

    Login Menu
    • Connections
    • Cut Outs
    • Disconnections
    • Earth Requests
    • Enquiries
    • Equipment Problems
    • SafeDig
    • Safety Advice
    • Service Alterations
    • Shrouding
  • Search
ICP design approvals
31/03/2017
01/05/2016
31/03/2017
Objectives completed

As of 31st March we completed work on this activity and achieved the following outcomes.

Since June 2017, we have published the average time it takes us to issue ICP point of connection and design approvals on our ‘how are we performing?’ website dashboard every month, over delivering on the commitment we made
Since the information was first added to the dashboard in June 2017, the webpage has been visited 243 times.
01/05/2016

ICP design approvals

Action
We will review of our ICP design approval process and make any necessary changes to ensure we can provide clearer and more timely responses to ICP submissions
The Outcome
Clear and timely approval of ICP design submissions
Target Measure
% reduction in approval time under new process
Voltage
LV
HV
EHV
RAG Status
Complete
Market Segments
M
U
DG
ICP

We reviewed our design approvals process for Independent Connections Providers.

Customers, in particular Lightsource and Green Frog Connect, advised us that they would value a quicker and more straightforward design approval for Independent Connections Providers (ICPs) that were relying on us to approve their designs. They highlighted complexities with approvals, which were completed by different departments, as well as a range of other valuable points of feedback for these services.

As a direct result of this customer feedback, we committed to review our processes and improve the approvals process to provide ICPs with a clearer and more timely response to design submissions. It was important during this review that we considered all elements of the connections works that require design approval, as it is important that ICPs receive a clear understanding which of these elements have received approval and which require further attention with an understanding of the aspects still to be resolved. To this end we have created a design approval process which documents all of the principal activities that require approval and within ten days we are able to respond to the ICP with the document where all of the individual approvals are noted.

Where it has not been possible to grant approval, we identify the aspects that are required to be resolved. In re-submitting the design, the ICP can then use this document to provide comments on how they addressed the issue. Using this new process we can provide the necessary input service in a way that is most helpful to the ICP that needs us to approve its designs whilst minimising our involvement and making the interaction as quick and efficient as possible. At our dedicated ICP Seminar in November 2016 we shared our solution which was very well received by the ICPs who attended.

View timeline
BACK TO TOP
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2023

Cookie settings