Skip to main content
announcement-icon Latest
announcement-icon-popup

Latest

Check out our be prepared page for advice on what to do before, during and after a power cut.

Have you joined our free Priority Services Membership? Find out more and join today

Check out our be prepared page for advice on what to do before, during and after a power cut.

Have you joined our free Priority Services Membership? Find out more and join today

  • About Us
  • Future Energy
    • Community Energy
    • Distribution System Operation
    • Electric Vehicles
    • Flexible Power
    • Green Recovery
    • Innovation
    • Network Data
    • Open Data Portal
    • Smart Metering
    • Investments in your area
    • Losses
    • New Power Generation
  • Support
    • Power Cuts
    • Priority Services Membership
    • Customer Service
    • Customer Welfare
    • A Force For Good
    • Be Prepared
    • Emergency Power Cuts
    • Weather Aware
    • British Sign Language Interpreter
    • Education
    • Safety
    • Saving Energy
    • Help & Information Directory
    • Services Directory
    • Document Library
    • Contact Us
  • Engagement
    • Our Plan 2023-28
    • Events
    • Stakeholder Engagement
    • Customer Engagement Group
    • Blogs
    • Your Powergrid
  • News
  • Careers

Login

WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

Login Menu
  • Connections
  • Cut Outs
  • Disconnections
  • Earth Requests
  • Enquiries
  • Equipment Problems
  • SafeDig
  • Safety Advice
  • Service Alterations
  • Shrouding
Northern Powergrid Homepage
  • My power is off
  • Get Connected
  • Our services
  • Contact us
  • More
    • About us
    • Power Cuts
    • Priority Services Membership
    • Customer Service
    • Customer Welfare
    • Be Prepared
    • Emergency Power Cuts
    • British Sign Language Interpreter
    • Careers
    • Contact Us
    • Community Energy
    • Customer Engagement Group
    • Distribution System Operation
    • Document Library
    • Education
    • Electric Vehicles
    • Events
    • Our Plan 2023-28
    • A Force For Good
    • Flexible Power
    • Help & Information Directory
    • Innovation
    • Investments in your area
    • Incentive Connections Engagement
    • Losses
    • News
    • Network Data
    • Open Data Portal
    • New Power Generation
    • Safety
    • Saving Energy
    • Services Directory
    • Smart Metering
    • Stakeholder Engagement
    • Weather Aware
Secondary Menu
  • Power cuts
  • Get Connected
  • Our services
  • Contact us

Emergency 24 hour number

National helpline

Power Cut

It is now simpler than ever to report a power cut. If you want to report a power cut call...

105

  • Call

    Emergency 24 hour number

    National helpline

    Power Cut

    It is now simpler than ever to report a power cut. If you want to report a power cut call...

    105

  • User

    WHICH SERVICE WOULD YOU LIKE TO LOG IN TO?

    At Northern Powergrid we provide a range of services, if you’d like to know more about each service please visit our services directory or our help and advice directory.

    Login Menu
    • Connections
    • Cut Outs
    • Disconnections
    • Earth Requests
    • Enquiries
    • Equipment Problems
    • SafeDig
    • Safety Advice
    • Service Alterations
    • Shrouding
  • Search
Standard design templates for ICPs
31/12/2016
01/06/2016
31/12/2016
Objectives completed

As of 31st December we completed work on this activity and achieved the following outcomes.

01/06/2016

Standard design templates for ICPs

Action
We will publish approved standard templates for 11kV, 20kV and 33kV connections for use by ICPs in their designs
The Outcome
Quicker approval of schemes designed by ICPs
Target Measure
% of ICPs using new standard templates
Voltage
HV
EHV
RAG Status
Complete
Market Segments
M
DG
ICP

We said we publish approved standard design templates for use by ICPs in their designs.

“Guaranteed standards on post acceptance information, harmonics etc.” 
Nick Gudgeon, Lightsource.

Following  feedback from our customer Lightsource, we included an action in our 2016/17 ICE work plan to improve the speed of the design approvals process by the use of pre-approved elements of the design, developing standard configuration templates for elements such as protection and civil elements of the work.

Pre-approving elements of the design by adopting standard template designs that ICPs can use consistently for similar types of jobs means that we are able to reduce significantly the time taken for approvals as it is necessary only to approve the designs once following which an ICP can then simply make reference to them being used in future schemes without the need for further approval to be granted. We worked collaboratively with ICPs to produce an approved set of standard template designs for 11kV, 20kV and 33kV connections.

This action was completed earlier than forecast and the templates made available on our Competition in Connections webpage for all ICPs to benefit from. To communicate this change in process we sent a brief to ICPs notifying them about the new process and communicated it again in person during an ICP Seminar we hosted in November 2016.

Alongside these improvements we are now currently working on a new 66kV standard template design, which is over and above our original commitment, but something we think will significantly benefit ICPs and EHV customers.

  • 11kV, 315-1000kVA UDE in Masonry Enclosure (ICP) drawing No C1065233
  • 11kV, 315-1000kVA UDE in Prefabricated Enclosure (ICP) drawing No C1065253
  • 11kV DNO Ring Direct Coupled IDNO Transformer drawing No C1065235
     
  • 20kV Distribution Substation in Prefabricated Enclosure (ICP) drawing No C1065716 
  • 20kV Distribution Substation in Masonry Enclosure (ICP) drawing No C1065717
     
  • For 33kV connections we have created a single page design information guide which provides direct links to all the information needed to design a 33kV metering substation
  • We understand that the complexity of designing a connection at EHV means it is often difficult for ICPs to provide a complete design in one submission. To address this we have produced a design submission guidance document (NPS/007/028 – Design Submission Requirements).
View timeline
BACK TO TOP
Footer
  • Our business Plan
  • Video-Library
  • Event & Surgeries
  • Meet The Executive
  • Sitemap
  • Accessibility
  • Cookies
  • Legal
  • Slavery Act
  • Terms and Condition
  • Privacy Policy
Connect With Us 24 Hours a Day
  • Northern Powergrid - Twitter 
  • Northern Powergrid - Facebook 
  • Northern Powergrid - Youtube 
  • Northern Powergrid - Instagram 

Copyright © Northern Powergrid Holdings Company 2023

Cookie settings